Start with two sliced plates, not one multiplied guess.

By GeekCode · Updated November 18, 2026 · Input guide

A useful cost comparison needs the totals for each layout you are actually considering.

Keep these five inputs separate.

  1. Parts on the plate. Count completed pieces of the same product. If a model needs several separately printed components, make the quantity consistent with your intended finished product.
  2. Total filament in grams. Include model, supports, flush and prime-tower material where those apply. Check what the slicer's total already includes. Do not add a waste figure again if it is already in that total.
  3. Print time for the whole plate. Slice both arrangements. Do not assume ten copies take exactly five times as long as two. Convert hours and minutes to decimal hours: 2 hours 30 minutes is 2.5 hours, not 2.30.
  4. Setup time per attempt. Enter hands-on preparation in minutes. The calculator repeats this cost in its full-plate failure allowance. Design work and one-off modeling fees are not included.
  5. Finishing time per completed part. Include hands-on work such as support removal for every produced piece. The tool assumes you finish extra stock too; use a separate scenario if you leave it unfinished.

Use a blended material price when necessary.

This tool accepts one price per kilogram for each comparison. If several filaments have different prices, use total material cost divided by total kilograms as a blended rate. Both plans must use that same blended rate to be directly comparable here. If their material mix differs substantially, this simplified tool is not a precise material-cost comparison.

Machine wear and electricity are different costs.

Enter a machine-wear hourly rate that excludes electricity and labor. Electricity is calculated from average watts, print hours and your price per kilowatt-hour. Nameplate maximum power is not necessarily average printing power; use a suitable measured value if you have one.

Know what the failure allowance assumes.

A 10% full-plate failure rate means each attempt has a 90% success chance. Expected attempts are 1 ÷ 0.9, or about 1.11, so the attempt budget is divided by 0.9. Setup repeats with each attempt; finishing happens after success.

This assumes a failed attempt uses a full attempt's resources. It does not model one piece failing halfway through a plate or predict the probability of meeting a deadline. Use 0% to see the base calculation before trying a failure scenario.

Reproduce a US$10.29 two-part estimate.

Choose “Compare a larger batch”. For Plan A, use 2 parts, 80 g and 2 hours; for Plan B, use 10 parts, 280 g and 7 hours. Open cost settings and choose USD. Enter US$20/kg filament, 120 average watts, US$0.20/kWh electricity, US$0.60/hour machine wear, US$25/hour labor and 10% full-plate failures. Set setup to 10 minutes per attempt and finishing to 3 minutes per completed part; these times apply to both plans. These are illustrative inputs, not measured printer performance or recommended rates.

Cost of one successful two-part plate under these assumptions
ItemCalculationUS$
Filament80 ÷ 1000 × 201.60
Electricity2 × 120 ÷ 1000 × 0.200.048
Machine wear2 × 0.601.20
Setup10 ÷ 60 × 254.1667
Attempt costSum of the four rows above7.0147
Expected attempt budget7.014666… ÷ 0.907.7941
Finishing after success2 × 3 ÷ 60 × 252.50
Expected total7.794074… + 2.5010.2941

The calculator uses full precision until display: US$10.29 total and US$5.15 per produced part for Plan A. At 0% failures, that total is US$9.51. The failure allowance is US$0.7794, applied to attempt costs; finishing is charged once. Packaging, shipping, selling fees and tax are excluded. The result is a production cost estimate, not a profit calculation.

Download the reference CSV for this scenario and a ten-part comparison using 280 g and 7 hours, with the same setup and finishing times. The CSV is generated from the calculator’s cost function and checked by its tests. The material-only example isolates the inventory decision.

Open the comparison